AML Construction 

Our Projects

List of Major Construction works completed during last 10 (ten) years

Sl. No. Name of Project Date of Commencement Date of Completion
1 Rectification work of Joydevpur – Mymensingh Road Improvement Project, Package WI-3 (Ch. 30+250 km to 59+850 km) November 2016 April 2017
2 Construction of Premix Carpeting road from ‘B’ type Qtr bldg No. P-23 to Gun garage building No. P-19 with footpath cum drain, external electric line including ancillary works at Bangabandhu Cantt. June 2016 July 2016
3 Construction of Accommodation for 1 x 1200 Cadets (8 story with 8 storied foundation) including ancillary Works for BMA Bhatiary, Chittagong June 2016 June 2018
4 Construction of 6-lane Mohipal Flyover on Dhaka – Chittagong National Highway at Feni December 2015 December 2017
5 Mawa Approach Road and Selected Bridge End Facilities, ICB No. PMB/AR/02. January 2014 July 2016
6 Construction of Service Area 2 under Padma Multipurpose Bridge Project, ICB No. PMB/SA/02 January 2014 July 2016
7 Establishment of Shaheed Sayed Nazrul Islam Medical College and Hospital, Kishoregonj(SH: Construction of 5-Storied Hospital Building and Single Basement with 10-Storied Foundation including Civil, Sanitary & Electrical Work) December 2013 March 2017
8 Construction of 4.010 km Road from Mowna Polli Biddut Zonal Office to Mowna Uttar Para Sub Package – 4 (Including Salna Overpass, Mowna Flyover Approach Road and Black Top of Sub Package – 2. November 2013 September 2015
9 Janjira Approach Road and Selected Bridge End Facilities under Padma Multipurpose Bridge Project, ICB No.: PMB/AR/01. 08 October 2013 07 June 2017
10 Dredging work by Cutter Suction Dredger for Maintaining Nabigability of Mawa – Mangalmajhi – Kathalbari – Charjanajat ferry and river route in the river Padma for the year 2013-2014 (Group-2) September 2013 June 2014
11 Construction of 1 x 110.00 Meter long Bridge including ancillary Works over lake from Sena Shahayak School to proposed JCO’s & OR’s residential area at Dhamalkot area Dhaka Cantt. June 2013 June 2015
12 Provision of earth filling (Partly) for construction of Officers JCO’s, OR’s Qtr and other structures at Dhamalkot area, Dhaka Cantt. Job No. 74/others of 2012-2013. March 2013 September 2013
13 Construction of 1 x SM Bk complex type ‘B’ (5 storey with 5 storied foundation) including ancillary Works for East Regt at Dhaka Cantt. (Group-1) March 2013 June 2015
14 Sirajganj Hard Point (SHP): Strengthening of different sections for total length of 1934m in Upazila: Sirajganj, Contract No.: BWDB: WMIP-FDR/BRE-SPL/W-04 January 2013 April 2015
15 Land development, construction of Ansar barrak and barbed wire fencing at proposed 400/230/132 kV Substation at Kaliakoir, Gazipur under Bibiyana – Kaliakoir 400kV and Fenchugonj – Bibiyana 230kV Transmission Line Project November 2012 March 2014
16 Dredging work by cutter suction dredger for maintaining navigability of Mawa – Mangalmajhi – Charjanajat ferry and river route in the river Padma for the year 2012-2012 (Group-2) September 2012 March 2013
17 Asphalt Concrete Overlay over the Runway at Hazrat Shahjalal International Airport, Kurmitola, Dhaka. April 2012 December 2013
18 Fael Khair Program: School-cum-Cyclone Shelters, Contract No. BD1-0013 (Package 1). August 2011 June 2015
19 Dredging of River Jamuna at Nalin Bazar, Upazila – Gopalpur, Tangail under Capital (Pilot) Dredging of River System in Bangladesh, Contract Package No. CDRSB-NB/Tang-01 February 2011 May 2012
20 Construction of road from Sultanpur to Akhaura check post. January 2011 January 2012
21 Construction of Part 2 (Overpass & Link Bridge Portion – Alignment E and F) of the Flyover at Mirpur – Airport Road and Overpass at Banani Rail Crossing. January 2011 December 2012
22 Dredging work by cutter suction dredger for maintaining navigability of Narayangong – Daudkandi river rout. October 2010 October 2011
23 Construction of 515.12 Meter Long P.C. Girder Bridge over “Dhaleshwari River” at Elasin in Tangail. October 2009 April 2012
24 Dredging work for maintaining navigability of Bhairab – Chatak river route in the river Surma and Baulai, Lot-01. September 2009 June 2010
25 Construction of 4 laning of 4th (P) & 5th (P) km. at Dhaka – Narayangonj link road by widening of existing pavement under Narayangonj Road Division of RHD Road Circle Dhaka during the year 2008-2009. Ch. 3+700 to Ch. 5+000m = 1300m. January 2009 December 2009
26 Dredging work for maintaining navigability of Mawa – Charjanajat ferry route, Lot-03. November 2008 February 2009
27 Contract No. 3 under Road Improvement Component of Road Network Improvement and Maintenance Project-II (RNIMP-II): Reconstruction of (i) Parbatipur – Fulbari – Madhayapara and (ii) Boda – Debigonj – Domar – Nilphamari Road. June 2008 April 2012
28 Construction of PALS Road at Osmani International Airport, Sylhet March 2008 September 2008
29 Periodic Maintenance Program 2007-08, Contract No. PMP/2007-08/08/Overlay works (Tranche-2) March 2008 Nevember 2008
30 Road Network Improvement and Maintenance Project-II, Contract Package No. PRMC-RZ-1: Periodic Road Maintenance Work on Dhaka (Mirpur) – Utholia – Paturia – Natakhola – Kashinathpur – Bogra – Rangpur – Beldanga – Banglabandh Road (N5) Ch. 237+000 (Rahabal, Dist-Gaibandha) to Ch. 278+000 (Pirgonj, Dist.- Rangpur) January 2008 April 2009
31 Road Network Improvement and Maintenance Project-II, Contract Package No. PRMC-RZ-4: Periodic Road Maintenance Work on Rangpur – Barobari – Kurigram Road (N506) Ch. 3+000 (Rangpur, Dist-Rangpur) to Ch. 23+000 (Tista Bridge, Dist.- Rangpur) January 2008 April 2009
32 Construction of Bank Rivetment work on the right bank of Jamuna River at Soilabari in Upazila – Sirajganj Sadar, District – Sirajganj, Contract No. RBS-07. January 2008 December 2010
33 Construction of Bank Rivetment work on the right bank of Jamuna River at Khokshabari in Upazila – Sirajganj Sadar, District – Sirajganj, Contract No. RBS-15. January 2008 December 2010
34 Construction of Bank Rivetment work on the right bank of Jamuna River at Ranigram in Upazila – Sirajganj Sadar, District – Sirajganj, Contract Package No. RBS-21 January 2008 November 2010
35 Construction of Bank Rivetment work on the right bank of Jamuna River at Ranigram in Upazila – Sirajganj Sadar, District – Sirajganj, Contract Package No. RBS-23 January 2008 November 2010
36 Contract No. PGCB/SA/2, Construction of 132 kV Shahjibajar – Ashugonj Transmission Line. January 2008 August 2009
37 Contract No. Dha/W-48/06-07, Construction of 90.00m long RCC bridge over Gulshan Lake connecting road no. 11 of Banani and road No. 41 & 240m connecting bridge to road No. 35/A of Gulshan under Tejgaon Circle District-Dhaka. September 2007 May 2009
38 Improvement Component of Road Network Improvement and Maintenance Project-I (RNIMP-I), Contract No. 5: Reconstruction of Thakurgaon – Ranisankail Road. June 2007 June 2010
39 Improvement Component of Road Network Improvement and Maintenance Project-I (RNIMP-I), Contract No. 4: Reconstruction of (i) Mithapukur – Madhayapara Road and (ii) Saidpur – Parbatipur Road. June 2007 March 2011
40 Construction of Riverbank Slope Protection work by Placing & Dumping of Cement Concrete Blocks and Geo Bags from Penchakhola to Mohonganj at PIRDP, Contract No. JMREMP/P-7/2006 March 2007 June 2008
41 Construction of Riverbank Slope Protection work by Placing & Dumping of Cement Concrete Blocks and Geo Bags from Horirampur to Penchakhola at PIRDP, Contract No. JMREMP/P-6/2006 March 2007 June 2008
42 Development of Navigability by Dredging of Dilalpur-Markuli-Sherpur-Jakigonj River Route, Group A-02, Lot No. 01 January 2007 May 2008
43 Construction of 293.92m long PSC Girder Bridge over the Surma River on the Sylhet-Gachbari-Kanaighat Bazar road at Kanaighat Bazar end. August 2006 April 2010
44 Land development & boundary wall of Chapai – Nababgonj District Stadium at Chapai – Nababgonj, Package No. W1. June 2006 December 2007
45 Extension and Modernization of Passenger Terminal Building & Construction of 1st Floor of Osmani International Airport, Sylhet (S. H:- Civil, Water Supply & Sanitary, Internal Electrification, Refurbishment and other Allied Works) April 2006 December 2008
46 Jamuna Bridge Access Roads Project, Contract for Kaliakoir Bypass March 2006 May 2008
47 Beautification Project, Contract No. 1: Widening and Beautification of Airport Road from Banani Rail crossing to North side of Mohakhali flyover. August 2005 June 2007
48 River Bank and wave Protection by dumping and/or placing sand filled geo-textile bages and concrete blocks, Contract Package No. JMREMP/P-4/2003 April 2005 July 2007
49 Development of Osmani International Airport for Operation of Wide Body Aircraft, Sylhet. March 2005 December 2007
50 Construction of “Monem Business District” Consisting of Three Towers each 14 storied over 20-storied foundation plus 4 & 2 basement floors. January 2005 December 2007
51 Construction of Underpass at 2nd KM of Polder Road (Sanir Akhra) Ch. 1 + 500 m. to 2 + 000m under Narayangonj Road Division, Contract No. DRC/NRD/UP/2002-05 October 2003 June 2007
52 Construction of 1×12′D’ Type Officer’s Quarter Building (14-storied) 4 flat in each floor, car parking in ground floor with other facilities. June 2003 April 2008

 

Current Contract Commitments / Works in Progress (On Going Projects)

Sl. No. Name of contract Date of Award Estimated completion date
1 Contract No.: SASEC-RCP/lCB/W-01 (Lot No. WP-02) Part-l: lmprovement of Road from Kaliakor Bypass intersection to Dulla Mari Road (18.00 km) from 2-Lane to 4-Lane including structures. Provision of support to project for third party maintenance quality check. December 2015 December 2018
2 Part-2: Performance-Based Maintenance Works on improved 4-Lane road from Kaliakor Bypass Intersection to Dulla Mari Road (18.00). January 2020 December 2023
3 Improvement of Jatrabari Intersection (including Equria-Babubazar link road) to Patchchar-Bhanga through Mawa road of Dhaka-Khulna (N-8) highway to 4 lane with separate lane for slow moving vehicle Project, Package – 06 May 2017 December 2018
4 Construction of 1 x 104 ‘C’/’D’ type Qtr (14 storey with 14 storied foundation with basement floor, Car parking & other facilities in basement floor & ground floor) including ancillary Works for 17 Inf Div at Sylhet Cantt. June 2017 June 2019
5 Construction of proposed 200 MW Power Plant Civil work of Bangla Trac at Titas, Doudkandi, Comilla October 2017 October 2018
6 Earthwork, widening, DBS etc pavement work construction of drain protective work, sign signal installation work from Chainage 109+000m to 129+000m of Comilla – Chandpur – Lakshmipur – Begumganj road (R-140) under Lakshmipur Road Division during the Year 2016-2017. Contract No. ADP/ACE/2016-2017/REGIONAL/PW-11 December 2017 September 2019
7 Earthwork, Reconstruction, Strengthening, DBS etc pavement work construction of drain, protective work, sign signal installation work from Chainage 30+610m to 60+000m of Comilla – Lalmai – Chandpur – Lakshmipur – Begumganj road (R-140) under Chandpur Road Division during the Year 2016-2017. Contract No. ADP/ACE/2016-2017/REGIONAL/PW-03 December 2017 June 2019
8 Earthwork, Reconstruction, Strengthening, DBS etc pavement work construction of drain, protective work, sign signal installation work from Chainage 60+000m to 88+790m of Comilla – Lalmai – Chandpur – Lakshmipur – Begumganj road (R-140) under Chandpur Road Division during the Year 2016-2017. Contract No. ADP/ACE/2016-2017/REGIONAL/PW-04 December 2017 September 2019
9 Construction of Connecting Road from Natore Road (RUET) to Rajshahi Bypass Road. Contract Package No.: RDA/RUETROAD/W/2017-2018/01. January 2018 April 2019
10 CP-05 “Construction of Viaducts and Elevated Stations (Bijoy Sarani, Farmgate and Karwan Bazar) between Agargaon and Karwan Bazar” July 2018 December 2021
11 A1: Construction of 4-lane Kalna Bridge (Nielson Lohse Arch Type) on AH1 along with construction of Toll Collection System with Toll Booths July 2018 June 2021